2024
2024
|
In 2024, JSC “Tatavtodor” had successfully finished construction, reconstruction and repair of 129 sites on public auto roads of the Republic of Tatarstan. Total length of constructed and reconstructed roads for the reporting period is 223 km. In the reporting period, construction works were performed on the following construction sites as part of the following programs:
|
- Program implemented with public-private partnership as a part of “Promotion of development of regional, public, municipal and local roads” local targeted program of Development of Transportation System” state program of the Russian Federation. The works were conducted on “Auto road Alekseyevskoye-Almetyevsk”, which is a part of toll highway “Shali (M-7) – Bavly (M-5)” in the Republic of Tatarstan, construction site km 43+216 – km 89+641 (part km 51+500 – km 61+400, 2nd stage) with total length of 9.9 km.
|
|

|
In 2024, JSC “Tatavtodor” performed a significant amount of construction works on “Construction of road interchange on “Chistopol-Nizhnekamsk” auto road km 89 in Nizhnekamsky municipal district of the Republic of Tatarstan”. Total cost of works is 2 billion rubles; total road length is 3.8 km,
|
- Overall development of urban transportation infrastructure as a part of a national project “Safe and quality auto roads” in Kazan, Naberezhnye Chelny and Nizhnekamsk urban areas. The works were conducted on 5 construction sites with total length of 13.9 km.
|
|
|

|
- Reconstruction of regional and municipal auto roads as a part of a national project “Safe and quality auto roads”. The works were conducted on 25 construction sites with total length of 38.9 km, in 21 municipal districts of the Republic of Tatarstan.
|
- Program for normalization of auto roads and artificial road constructions as a part of national project “Safe and quality auto roads”. The works were conducted on “Overhaul reconstruction of Aktanysh-Poisevo auto road, km 22+090 – km 25+892” construction site 3.8 km long in Aktanyshsky municipal district of the Republic of Tatarstan.
|
|
In 2024, we have built and reconstructed 35.3 km of municipal auto roads:
|
- Works for implementation of Municipal program for road works on public local auto roads for year 2024 in the Republic of Tatarstan.
Total cost of works is 278 million rubles; total road length is 14.3 km, works conducted in 7 municipal districts of the Republic of Tatarstan.
|
- Reconstruction of asphalted road network in the centers of municipal districts and cities of the Republic of Tatarstan.
Total cost of works is 249 million rubles; total road length is 8.6 km, works conducted in 11 municipal districts of the Republic of Tatarstan.
|
|
|
- Normalization of road network in the inhabited localities of the Republic of Tatarstan (transitional type of road surface).
Total cost of works is 188.2 million rubles; total road length is 12.4 km, works conducted in 8 municipal districts of the Republic of Tatarstan.
|
For the reporting period, access roads with solid surfacing were constructed in 8 inhabited localities of our republic, with total population of 1,021 thousand people. Works were conducted at 8 construction sites with total length of 13.6 km in 7 municipal districts of the Republic of Tatarstan:
Municipal district
|
Construction site
|
Locality
|
Length, km
|
Asphalted surface
|
Aksubayevsky
|
Reconstruction of “Aksubayevo-Yemelkino” – Stary Chuvashsky Adam auto road in Aksubayevsky municipal district of the Republic of Tatarstan
|
Stary Chuvashsky Adam village
|
1.440
|
Kukmorsky
|
Construction of Access road to Malaya Chura settlement in Kukmorsky municipal district of the Republic of Tatarstan
|
Malaya Chura settlement
|
1.910
|
Menzelinsky
|
Construction of “M-7 “Volga” – Konovalovka” – Staraya Ashpala in Menzelinsky municipal district of the Republic of Tatarstan (2nd stage)
|
Staraya Ashpala village
|
1.767
|
Tiulyachinsky
|
Overhaul reconstruction of access road to Kara-Sherma village in Tiulyachinsky municipal district of the Republic of Tatarstan
|
Kara-Sherma village
|
1.180
|
Transitional type surface
|
Aksubayevsky
|
Overhaul reconstruction of road network in inhabited localities of Aksubayevsky municipal district of the Republic of Tatarstan (access from auto road “Chistopol-Aksubayevo-Nurlat-Urmandeevo” - Sidulovo – Yerykly)
|
Sosnovka settlement
|
0.530
|
Kaybitsky
|
Construction of “Karatun – Cheremshan – Bolshoye Podberezye” – Pleteny auto road in Kaibitsky municipal district of the Republic of Tatarstan
|
Pleteny village
|
4.103
|
Construction of “Bolshiye Kaybitsy- Kamylovo” – Nadezhdino – Kichkeyevo auto road in Kaibitsky municipal district of the Republic of Tatarstan
|
Kichkeyevo village
|
2.462
|
Nizhnekamsky
|
Overhaul reconstruction of road network in inhabited localities of Nizhnekamsky municipal district of the Republic of Tatarstan (access from auto road “Chistopol-Nizhnekamsk” – Krasnaya Kadka)
|
Baygulovo settlement
|
0.204
|
|