December 24, 2022 – skiing tryouts for future races for employees were held in Buinsky branch of JSC “Tatavtodor”.
The results of the III Republican competition "Engineer 2022" have been announced. The winner in “Construction and construction materials industry” nomination, category “Future engineers”, became Valeria Ye. Brodneva, engineer from Production and technical Department of JSC “Tatavtodor”.
Gratitude of the Ministry of Construction, Housing and Utilities of the Russian Federation "For great professional achievements and fruitful work" was presented to Pavel A. Chernov, Head of Geodetic group of JSC "Tatavtodor".
Equipment and production bases of JSC “Tatavtodor” have been successfully prepared and now ready for exploitation during winter period of 2022-2023.
Construction works on “Alekseyevskoye – Almetyevsk” auto road according to current yearly plan are finished. Road surface was constructed on km 51+500 – km 61+400, which is a part of the “Shali (M-7) – Bavly (M-5)” toll highway in the Republic of Tatarstan.
Dear colleagues, Our congratulations to you on the Road Workers’ Day! We wish you strength and good health, enthusiasm and success at work, well-being, and lots of sincere gratitude for your work!
“Preparation of road construction machinery and vehicles for 2022-2023 autumn-winter construction season “seminar was held on October 7, 2022 in Aksubayevsky branch of JSC “Tatavtodor”.
October 4, 2022: Total amount of asphalt-concrete mix produced by asphalt plant of Nizhnekamsky branch of JSC “Tatavtodor” has exceeded 100 thousand tons since the beginning of the construction season of 2022.
News 71 - 80 of 633 First | Prev. | 6 7 8 9 10 | Next | Last