Chronicle of Work

Chronicle of Work

05/18/2026

Аrsky Branch

05/18/2026

Buinsky Branch

05/16/2026

Apastovsky Branch

05/16/2026

Аrsky Branch

Local road maintenance in Arsky district of the Republic of Tatarstan (Arsky district)

Repair of worn-out surface layers with hot asphalt-concrete mixes.

05/15/2026

Аrsky Branch

05/15/2026

Apastovsky Branch

05/14/2026

Menzelinsky Branch

05/13/2026

Apastovsky Branch

Bolshiye Kaybitsy – Kamylovo: 24+400 - 25+332 (Kaibitsky district)  

Construction of the stone mastics (grade 8) surface layer is finished.

05/12/2026

Menzelinsky Branch

05/12/2026

Mamadyshsky Branch

Local road maintenance in Mamadyshsky district of the Republic of Tatarstan (Mamadyshsky district)  

Summer auto road maintenance works.

05/11/2026

Apastovsky Branch

Bolshiye Kaybitsy – Kamylovo: 24+400 - 25+332 (Kaibitsky district)  

Construction of levelling course using А16Нн asphaltic mix.

05/08/2026

Sabinsky Branch

Liuga – Nyrtuinsky collective farm: 18+249 - 24+000 (Kukmorsky district)  

Milling of the asphaltic surface course.

05/07/2026

Aksubaevsky Branch

Local road maintenance in Aksubayevsky district of the Republic of Tatarstan (Aksubayevsky district)  

Summer seasonal auto road maintenance works.

05/06/2026

Apastovsky Branch

Ulanovo – Karatun: 47+880 - 48+917 (Apastovsky district)  

Construction of the stone mastics (grade 8) surface layer.

05/06/2026

Mamadyshsky Branch

Local road maintenance in Mamadyshsky district of the Republic of Tatarstan (Mamadyshsky district) 

05/05/2026

Sabinsky Branch

Local road maintenance in Sabinsky district of the Republic of Tatarstan (Sabinsky district)  

Reconstruction of worn-out stone mastics layers (grade 8, 4 cm thick) on the Satyshevo – Bogatye Saby part of the auto road.

05/05/2026

Apastovsky Branch

Ulanovo – Karatun: 47+880 - 48+917 (Apastovsky district)  

Construction of levelling course using А16НT asphaltic mix.

05/04/2026

Buinsky Branch

Local road maintenance in Drozhzhanovsky district of the Republic of Tatarstan (Drozhzhanovsky district)  

Pothole repair with asphalt-concrete mixes.

05/04/2026

Apastovsky Branch

“Kazan – Ulyanovsk” – Staroye Baryshevo – Kamskoye Ustye: 7+150 - 8+060 (Kamsko-Ustyinsky district)  

Milling of the asphaltic surface course and widening to the roadbed notes with macadam-and-sand mix (C4 M-800 grade) is finished.